Construction Update · 15 July 2026
Services Installation and Ground Works

Services installation is now underway across the site. Crews are laying underground drainage, water mains, and electrical conduits that will service the development.
This work needs to be completed before foundation concrete goes in. Once the concrete is down, access to these services becomes difficult, so getting them right now is critical.
Drainage lines have been installed to engineering specifications. Fall and gradient have been checked to ensure proper flow. Inspection chambers are positioned at key points for future access and maintenance.
Water supply mains are being connected to the council network. Pressure testing will be completed before the lines are covered. Electrical conduits for power and data are also being trenched in parallel.
“The site is being worked in sections to keep things moving. Services go in first, then formwork and steel, then concrete. That way there are no delays waiting for one trade to finish.”